The first row of cement block that will form the stemwall. Since I have no large washes in my area of the desert and since we get torrential thunderstorms in the summer, I was required to raise my floor one foot above the ground. I stacked two rows of these block both on the inside and then the outside of the foundation, then filled it with more rebar and concrete. The vertical rebar from the foundation holds this stemwall in place.